Team 3-3 : Team Failure
- Team Agreement
Meeting Log
- Tuesdays at 3PM, and Sundays if needed.
Weekly Summaries
- Week of October 28, 2007: Met to organize several truss designs and to set them up for static modeling.
- Tuesday, November 27, 2007: The rest of the summaries have been logged and compiled into the progress report.
Design Log
- Several Sketches have been made on paper and in Matlab and will be posted on this page shortly.
Main Sophomore Clinic wiki Page: http://sophclinic.pbwiki.com/.
Progress Report
-
Design Log
--Keep track of designs under consideration, updating the status of each as needed. Show designs as figures and annotate with information about how the design was developed, how it has been evaluated, what you have determined, and what you are doing with the design as a result of your analysis. Do not delete designs that have been eliminated; this should be a complete record of all ideas that the team considered.
Alex Baker (Bakera00@students.rowan.edu)
Matt Bellifemine (Bellif80@students.rowan.edu)
Luke Cuccurullo (Cuccur78@students.rowan.edu)
Matt Gagne (Gagnem40@students.rowan.edu)
Comments (2)
Anonymous said
at 11:04 pm on Dec 19, 2007
I don't think you should have called yourselves "Team Failure." That seems to be overstating things and characterizes your project solely in terms of your mistake.
Anonymous said
at 11:07 pm on Dec 19, 2007
Seems like the wiki got off to a good start but was abandoned early on. Perhaps if you had used this as a place for posting your thoughts on the design process, someone would have raised the issue of whether your original design was sound. You might have caught your mistake in time. I say this based on another wiki where someone posted information on a mistake he discovered (the title of the post is "A Close Call").
You don't have permission to comment on this page.